Laserfiche WebLink
M`` <br />DATE: March 12, 2001 <br />TO: Jim Stover <br />FROM: Joe Dudash <br />The purpose of this E-Mail is to outline the result of our telephone conversation of 3/12/01 <br />concerning the Bowie No.l Mine and the Bowie No. 2 Mine. <br />Bowie No. 1 Mine <br />1. Submit a technical revision to remove the train loadout from the Bowie No. 1 Mine permit <br />(transfer the train loadout from the Bowie No. 1 Mine to the Bowie No. 2 Mine) and to <br />request a bond reduction, as detailed in Rule 3.02.2(5), for the removal of the train loadout <br />reclamation cost from the Bowie No. 1 Mine permit (transfer the train loadout reclamation <br />liability from the Bowie No. 1 Mine to the Bowie No. 2 Mine). For completeness, the <br />submittal must contain revised text pages. The adequacy review will deal with any text or <br />maps that need revision but were missed in the original TR application submittal. The public <br />notice of completeness for this TR should state both the request for the loadout transfer and <br />the request for a bond reduction due to the reclamation liability transfer from the Bowie No. <br />1 permit to the Bowie No. 2 permit. <br />2. Submit a bond release application for the reclamation work at the east mine and the west <br />mine. The original bond liability stated in the application should not take into account the <br />proposed bond reduction since the bond reduction will not be final at the time of the bond <br />release application submittal. <br />Bowie No. 2 Mine <br />Submit a technical revision to include the train loadout into the Bowie No. 2 Mine permit <br />(transfer the train loadout from the Bowie No. l Mine to the Bowie No. 2 Mine). The TR <br />submittal must include revised text and maps. Any text or maps that need revision but were <br />missed in the original submittal will be dealt within the adequacy review. The submittal <br />must include an increase in the reclamation liability to account for the train loadout. <br />The two technical revisions must be called complete by the NOV abatement date of March 20. <br />The bond release application must be submitted by March 20. It would be a good idea to submit <br />the applications a few days before Mazch 20, in case something unexpected pops up. If you have <br />any questions, please call or E-Mail me. <br />c:1ms97\bowie 1 Uoadoutemail I <br />