Laserfiche WebLink
09/25/2002 12:13 7199424178 AZURITE PAGE 02(02 <br />At this point in time, 99% of a!1 grading or road removal is complete. 1' <br />accomplished over the next three to five years wt11 be vegetation establishtn <br />been disturbed. during the past three years due to highwall removal asul/or re- <br />havenot developed ground cover, diversity or evidence of self sustaiaability <br />re-seeding and mulching operations over app. twenty five acres of disturbs <br />watering maintenastoe site wide for the next two to three years, followed by a <br />system compoaetrts (plastic Pipe, tanks) during years four and five. By c <br />mulching operations an addi#ionat foie to five soasons, it is hoped that the site <br />degree of ground cover, diversity, and self-cnets~;n l+it;ty t0 meet minimum <br />regarding this site. The operator therefore requests a bond amotmt refle <br />comtttitment over the next five years. <br />Thank you for your consideration of this request. I am looking forward to b <br />In the event that the Division determines that a site visit is necessary, Mr. <br />schedule a time is trod October sn that he may be in sttenda~e. <br />Very Truly Yours, <br />Kenneth S. IGlco <br />Consuhing Geologist <br />Azurite, Inc. <br />Copy: Ivlr. Tom $rooks, G-P Gypsum <br />~~ ~~ <br />~~. ~ ~ <br />~i <br />r <br /> <br /> <br />be <br />ve <br />xd <br />~d <br />tg <br />is <br />~ Ctt_~-o~ '°~`~` <br />.~ <br />~ ~~ <br />6-P a~ <br />Q a.~~f~o~ , /~ <br />