My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
REV00176
DRMS
>
Back File Migration
>
Revision
>
REV00176
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/25/2016 12:57:53 AM
Creation date
11/21/2007 8:43:51 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981013
IBM Index Class Name
Revision
Doc Date
1/28/2004
Doc Name
Adequacy Letter
From
DMG
To
Peak Project Management
Type & Sequence
TR55
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
3
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Basin Resources <br />1/28/04 <br />Page 2 <br />5. Please verify that all grout, and other shaft closure materials will be contained and <br />prevented from leaving the shaft closure site. Also verify that all such materials <br />will be properly cleaned from the surface site and disposed of properly. <br />6. Please provide the details of the required sediment control plan to be implemented <br />prior to, during and after the shaft closure project activities. <br />7. The application lacks detail regazding the final backfilling, grading and <br />achievement of approximate original contour at the shaft site. In accordance with <br />Rule 2.05.4(2)(c), please provide a plan for backfilling, soil stabilization, and <br />grading. Include appropriate postmining contour maps and cross sections that <br />represent the fmal surface configuration at the reclaimed shaft site. <br />8. Provide a detailed description and plan for access to the shaft site. Provide <br />specific details of any needed road, ramp or other site access construction and <br />reclamation requirements. Include maps, figures and cross sections as appropriate. <br />9. Please specify all topsoil salvage and replacement, and revegetation plans. <br />Include topsoil salvage and replacement quantities and specific seed mix and <br />application rate plans for the disturbed azea including the immediate shaft site and <br />any access azeas. <br />10. A reclamation bond must be submitted to address the closure of the vent shaft. It <br />is likely that the current bond is not adequate to fully cover the shaft closure as <br />proposed along with any surface disturbance. Provide a bond estimate calculation <br />for the proposed activity including the down hole and surface work. <br />Please provide an adequate response as soon as possible so that we may issue a final <br />decision by March 2, 2004. <br />Please call with any questions. <br />vrsor <br />
The URL can be used to link to this page
Your browser does not support the video tag.