Laserfiche WebLink
~- a <br />r <br />The additional bond liability resulting from this revision is as follows: <br />Core holes are expected to be approximately 5" - 6" on diameter. The additional cost to <br />seal these three additional locations is as follows: <br />3 - 6" diameter holes, Portland cement - $985.92 ea - $ 2,957.76 <br />3 Octoplugs fora 6" hole - $115.31 ea $ 2,190.89 <br />3 mazkers - $3.37 ea $ 64.03 <br />Total direct costs $ 5,212.68 <br />Induect costs @ 17.8% <br />Total Cost <br />$ 927.86 <br />$ 6,140.54 <br />Current unit values for Trapper's bond were used in the above calculations. <br />In addition, attached Table MR-213-1 should be inserted into Appendix A. This table <br />summarizes the total additional reclamation liability associated with the project. The <br />total added cost is $44,085.80 including indirect costs. <br />It is Trapper's understanding that pre-approval of this work is required due to the <br />geotechnical nature ofthe project and it's relation to the East Panel landslide. <br />Please contact me or Jim Mattem if you have any questions regazding the enclosed <br />information. <br />Sincerely,~~ <br />Lam' <br />orrF~~~Luke <br />Environmental Manager <br />FVL [M/Permit Revisions/MR212 Cover Letter.docJ <br />c Janet Binns-two copies w/ attachments <br />John Husband, BLM w/ attachments <br />File ] 09.2.3.4 w/o attachments <br />Revisions File <br />