My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
REV00094
DRMS
>
Back File Migration
>
Revision
>
REV00094
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/25/2016 12:57:49 AM
Creation date
11/21/2007 8:43:08 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1992113
IBM Index Class Name
Revision
Doc Date
6/17/1993
Doc Name
REGULAR OPERATION 112 RECLAMATION PERMIT APPLICATION FORM
Type & Sequence
CN1
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
5
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />_¢. <br />'lotice Requirements <br /> <br />Immediately after the first publication of your notice in a newspaper of general <br />;irculatlon 1n the locality of your proposed mining operation, you must mail a copy of <br />the notice to all owners of record of surface rights to the affected land and all owners <br />of record of lands that are within 200•feet of the boundary of the affected land. <br />Notice requirements are specified in Rule 2.2. A copy of a form which includes all <br />required information for the notice has been attached for your use. You will need to <br />provide the Division proof of notice prior to the decision date, which may be by <br />submitting return receipts of a certified mailing or by proof of personal service <br />(Rule 2.2.2(6)). <br />NOTE TO COMMENTORS/OBJECTORS: It is likely there will be additions, changes, and <br />deletions to this document prior to final decision by the Mined Land Reciamation Board <br />or Division. Therefore, tf you have any comments or concerns, you should contact the <br />applicant or the Division prior to the decision date so that you will know what changes <br />may have been made to the application document. <br />The Division is not allowed to consider comments, unless they are written, and received <br />prior to the end of the public comment period. You should cohtact the applicant for the <br />final date of the public comment period. <br />If you have questions about the Mined Land Reclamation Board and Division's review and <br />decision or hearing process, you should contact the Division at (303) 866-3567. <br />As an authorized representative of the applicant, I hereby certify that the operation <br />described herein has met the minimum requirements of the following terms and conditions: <br />1. This mining opesc.: <. .=. '.1 not adversely affect the stability of tier <br />significant, valuable and permanent man-made structure(s) located wt ti. ,.. ~•..,: <br />hundred (200> fee of the affected lands. However, where there is an agreement that <br />damage to the structure 1s be be compensated for by the applicant/operator (C.R.S. <br />34-32-115(4)(d)), then mining may occur within 200 feet. Proof of an agreement <br />must be submitted to the Division prior to the decision date. <br />2. No mining operation will be Located on lands where such operations are <br />prohibited by law (C.R.S. 34-32-ti5(4>(f>); <br />3. As the applicant/operator, I'do not have•any mining/prospecting operations in <br />the State of Colorado currently in violation of the provisions of the Mined Land <br />Reclamation Act CC.R.S. 34-32-120) as determined through a Board finding. <br />
The URL can be used to link to this page
Your browser does not support the video tag.