Laserfiche WebLink
<br />Exhibit L -Reclamation Costs <br />There is no change proposed to the reclamation bond for this operation. The additional lands will <br />be mined as in the case in the existing permit. The amount of disturbed acreage will not be <br />increased. The haul roads will be left for the property owners use following reclamation of the <br />site. <br />L:U.ANDFlLF799T~CA0.NERSIHAYFlELD9IAMD SAM <br />