My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
REV00039
DRMS
>
Back File Migration
>
Revision
>
REV00039
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/25/2016 12:57:46 AM
Creation date
11/21/2007 8:42:42 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1988112
IBM Index Class Name
Revision
Doc Date
11/25/1998
Doc Name
BMRI SAN LUIS MINE PN M-88-112
From
BATTLE MOUNTAIN GOLD
To
DMG
Type & Sequence
TR15
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
2
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
~ iii iiniiiiniii iii <br />Baffle Mountain Gold <br />ANNE C. BALDRIGE <br />VICE PRESIDENT <br />ENVIRONMENTAL AND GOVERNMENTAL AFFAIRS <br />BY FACSIMILE <br />HARD COPY TO FOLLOW BY MAIL <br />November 25, 1998 <br />Mr. Mike Long <br />Director <br />Colorado Division of Minerals and Geology <br />1313 Sherman Street, Room 215 <br />Denver, Colorado 80202 <br />RE: BATTLE MOUNTAIN RESOURCES, INC. (BMRI) <br />SAN LUIS MINE, CMLRB PERMIT NO. M-88-112 <br />Deaz Mike: <br /> <br /> <br />,.r.~eraistiGe010gY <br />On November 16, 1998 BMRI submitted a revised Response Plan in accordance <br />with the requirements of TR-15. This Plan summarized the data and analyses conducted <br />to date to characterize the elevated total dissolved solids (TDS) levels previously <br />identified in monitoring well M-1 I R and the response measures, including interim <br />containment, which have been implemented by BMRI. The Plan also sets forthithe <br />technical studies BMRI believes aze necessary to fully characterize the surrounding <br />hydrogeology in sufficient detail to allow the evaluation and design of long tern[ response <br />measures and establishes a schedule for their implementation. <br />BivIRI would like to propose that an item be sciredukd on the agcuda fur the <br />December Boazd meeting to allow BMRI and the Division to make a presen[a[ign <br />regarding the current understanding of the nature of the TDS problem, the interim <br />response measures in place at the site, and the schedule and approach outlined in the <br />Response Plan for long term response measures. As we have discussed, it is BMRI's <br />preference that the Response Plan be incorporated into an enforceable compliance order <br />and we therefore waive the required notice period as necessary to accommodate a formal <br />public hearing to consider and approve a mutually agreeable order. <br />In this regazd, we would request that we commence discussions regarding the <br />possible terms of such an order as well as working out any differences of opinion <br />regarding the elements of the Response Plan as soon as possible. Given the potential for <br />333 CLAY STREET • SUITE 4200 HOUSTON, TEAS 77002-4103 (7131 653-7229 FA% (7131 650-3636 TELEX 763604 <br />
The URL can be used to link to this page
Your browser does not support the video tag.