Laserfiche WebLink
<br /> <br /> <br />EXHIBIT "L" <br />The costs Involved in the reclamation process are projected (estimated) <br />to be as follows: <br />A. Costs of relayering, over-burden and <br />topsoil, Including grading and sloping 85,000.00 <br />B. Discing of slopes to hold seed $1,000.00 <br />C. Revegetation of areas outside of water - <br />$200.00 an acre flat surface resooding, <br />hydromulching or seeding on sloped areas <br />$300.00 an acre. Reseeding estimate, then $1,200.00 <br />D. Other expenses: <br />(I) Application fee for ) <br />permit $ 275.00 ) <br />N/A for <br />(il) Estimate of surety ) Reclamation <br />bond for reclama- ) Purposes <br />tion 1000.00 ) <br />51275.00 ) <br />TOTAL PROJECTED EXPENSES: <br />For Actual Reclamation $7.200.00 <br />C 0~/~ ~~~NT/,4 ,C <br />~- <br />EXHIBIT "L" <br />Reclamation Costs <br />