Laserfiche WebLink
~. • <br />EXHIBIT "L" <br />~i <br />The costs involved in the reclamation process are projected (estimated) <br />to be as follows: <br />A. Costs of relayering, over-burden and <br />topsoil, including grading and sloping $5,000.00 <br />B. Discing of slopes to hold seed $1,000.00 <br />C. Revegetation of areas outside of water - <br />$200.00 an acre flat surface reseeding, <br />hydromulching or seeding on sloped areas <br />$300.00 an acre. Reseeding estimate, then $1,200.00 <br />D. Other expenses: <br />(i) Application tee for ) <br />permit $ 275.00 ) <br />,q ) N/A for <br />/" (ii) Estimate of surety ) Reclamation <br />~ ~_ bond for reclama- ) Purposes <br />t _,,,Z~'~ /j t ion 1000.00 ~ <br />~ (f $1275.00 ) <br />TOTAL PROJECTED EXPENSES: <br />For Actual Reclamation $7.200.00 <br />~ ~ ~~ ~',, ~ C . <br />C orv~~~~~vri~.~ <br />EXHIBIT "L" <br />Reclamation Costs <br />