My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
HYDRO31638
DRMS
>
Back File Migration
>
Hydrology
>
HYDRO31638
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 8:55:15 PM
Creation date
11/21/2007 2:08:26 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1980005
IBM Index Class Name
Hydrology
Doc Date
11/12/1993
Doc Name
2nd Qtr 1993 Inspections
From
PEABODY WESTERN
To
DMG
Permit Index Doc Type
SEDIMENT POND INSPECTIONS
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
27
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
PERIODIC INSPECTION FORM <br />Stockponds or Sumps <br />INSPECTOR'S NAME: Tom Wainwright DATE: June 10, 1993 <br />FACILITY CONFIGURATION: Stockpond DATE LAST INSPECTION: <br />SITE NAME: T-1 SITE LOCATION: SE'aSW~, Sec 2, TSN, R87W <br />MINE NAME: Seneca II LOCATION: 7.1 mi SE of Hav den, Colorado <br />MINE I.D. NO.: C-80-005 OWNER'S REP.: Scott Williams, Supt. <br />Circle or write in appropriate response <br />1. Angle of elope: 3:1 upstream, 4:1 downstream Total = 7_1 N/A <br />2. *Seepage (specify location, color, and approximate volume) <br /> At isolated points on embankment slopes: Yea ~No~ N/A <br /> At natural hillside: Yee CNo N/A <br /> Over widespread areas: Yes ENO N/A <br /> From downstream foundation area: Yes ENO, N/A <br /> "Boils" beneath stream or ponded water: Yes ~d N/A <br />3. Cracks or scarps on crest: Yea `NOJ N/A <br />4. Cracks or scarps on elope: Yes ~o~ N/A <br />5. Sloughing or bulging on slope: Yea `NO, N/A <br />6. *Major erosion problems: Yes No N/A <br />7. Surface movements in valley bottom or on hillside: Yee No: N/A <br /> ~ <br />8. *Erosion of toe: Yes :I'LO~ N/A <br />9. *Water impounded against downstream toe: Yes `N~, N/A <br />10. Existing embankment freeboard: See Comments feet <br />11. Increase Decrease in water level: feet <br />12. Cracks, bulging, or erosion on upstream face: Yea LNO~ N/A <br />13. Spillway erosion: `_e"s No N/A <br />14. *Clogging <br /> Spillway channels: Yes crlo N/A <br /> Diversion ditches: Yes .~ N/A <br />*Major adverse changes in these items could cause instability and should be reported to <br />the Engineering Manager and Mine Superintendent for further evaluation. Adverse conditions <br />noted in these items should normally be described (extent, location, volume, etc.) in the <br />apace on the back of this sheet. <br />
The URL can be used to link to this page
Your browser does not support the video tag.