My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
HYDRO31599
DRMS
>
Back File Migration
>
Hydrology
>
HYDRO31599
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 8:55:14 PM
Creation date
11/21/2007 2:04:11 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1999002
IBM Index Class Name
Hydrology
Doc Date
2/9/2000
Doc Name
FINAL AREA PERMIT VIC ISSUED TO AM SODA P 83-164
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
82
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
1 December 23, /999 ~ • Page 5 <br />' Evaluate the water-level measurements and analytical data for groundwater samples <br />' extracted from the Upper Aquifer and the Lower Aquifer to determine if there is an <br />indication of aquifer communication. <br />' Perform a natural gamma log of the borehole to confirm the movement. The gamma <br />log will be compared to the data obtained during installation of the solution mining <br />' well to confirm movement. <br />• Consult with CDMG, BLM, and EPA regarding the results of the above-described <br />tests to determine an appropriate action plan. If the evidence indicates that <br />significant movement has occurred in the Mahogany Zone and that there is a <br />' significant potential for aquifer contamination, the ultimate corrective action would <br />be to cease active mining and abandon the well. <br />' The process monitoring systems are described in Section 5.0 of the Groundwater and Surface <br />Water Monitoring Plan. If cavern integrity is lost as determined by the process monitoring systems <br />' outlined in Table 4 of the Groundwater and Surface Water Monitoring Plan, then corrective action <br />' would be initiated according to procedures outlined in Section 6.9.3 of the Groundwater and Surface <br />Water Monitoring Plan. <br />' 6.0 QUALITY ASSURANCE AND QUALITY CONTROL <br />' Procedures for quality assurance and quality control (QAQC) will be developed prior to <br />commencement of commercial operations. The QAQC procedwes will address data collection, <br />t frequency, accuracy, recording, and reporting <br />' 7.0 REFERENCES <br />' Dowding, C.H., M.B. Su, K. O'Conner (1988), "Principles of Time Domain Reflectometry Applied <br />to Measurement of Rock Mass Deformation," Int. J. Rock Mech. Sci. and Geomech. <br />' Abstr., 25(5). <br /> <br />i~ <br />i~ <br />Agapito Associates, Inc. <br />
The URL can be used to link to this page
Your browser does not support the video tag.