My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
HYDRO31599
DRMS
>
Back File Migration
>
Hydrology
>
HYDRO31599
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 8:55:14 PM
Creation date
11/21/2007 2:04:11 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1999002
IBM Index Class Name
Hydrology
Doc Date
2/9/2000
Doc Name
FINAL AREA PERMIT VIC ISSUED TO AM SODA P 83-164
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
82
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />1 <br />t <br /> <br />1 <br /> <br /> <br /> <br /> <br />December 13, / 999 • • Page !-I <br />During the baseline period, all Piceance Site monitoring wells that are completed in zones <br />above the Dissolution Surface (including in Hanel and our-of--pane! wells) will be sampled <br />monthly for water quality. The monthly water quality samples from wells completed above the <br />Dissolution Surface will be analyzed for the parameters on the WQ2 list. All Dissolution Surface <br />wells (in-panel and out-of-panel) will be monitored monthly for water level, conductivity, and <br />temperature. This baseline sampling frequency exceeds the CDMG requirement for the collection <br />of eight baseline measurements in a 5-quarter period. <br />During the operations period, Piceance Site in-pane! wells completed in zones above the <br />Dissolution Surface will be monitored monthly for water quality. The monthly water quality <br />samples from these in-pane/ wells will be analyzed for WQl parameters monthly and WQ2 <br />parameters quarterly. Oul-of--panel wells completed in zones above the Dissolution Surface will <br />be monitored quarterly. Water quality samples from these out-of--pane! wells will be analyzed for <br />WQ2 parameters. All Dissolution Surface wells (in-panel and out-of--panel) will be monitored <br />weekly for water level, conductivity, and temperature. <br />At the Parachute Site, the alluvial monitoring well will be sampled for water quality on a <br />monthly basis. Samples will most likely be analyzed for WQl parameters and/or other parameters <br />that are applicable to the site characteristics and the processes in operation at the Parachute <br />' facility. <br />Available domestic wells will be sampled for water quality on a quarterly basis during <br />' both the baseline period and the operations period. Samples will be analyzed for WQl parameters <br />on a monthly basis. <br />' Groundwater Quality Sampling Procedures <br />Groundwater samples will be collected according to the procedures outlined in <br />' Appendix C. Sampling equipment will be decontaminated as described in Appendix D. <br />At the Piceance Site, American Soda has used EPA-approved, dedicated micropurge <br />' systems, when possible, for water quality sample collection during the test mine phase. <br />Conventional water sampling techniques are not appropriate because of the significant depth of <br />' most of the Piceance Site monitoring wells. The large volume of water in the well casing renders <br />purging three casing volumes impractical. Therefore, American Soda will use dedicated <br />' micropurge systems in the collection of samples from monitoring wells at the Piceance Site. <br /> <br />' Agapito Associates, lnc. <br />
The URL can be used to link to this page
Your browser does not support the video tag.