My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
HYDRO31591
DRMS
>
Back File Migration
>
Hydrology
>
HYDRO31591
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 8:55:13 PM
Creation date
11/21/2007 2:03:08 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1977215
IBM Index Class Name
Hydrology
Doc Date
12/21/1999
Doc Name
BULLDOD MR PROJECT NOV 1999 MONTHLY MONITORING REPORT
From
HOMESTAKE
To
DMG
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
11
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Table 1 Monitoring required by DMG after plug closure <br />(once conditions behind plug stabilize and tracer is injected) (continued) <br />ID Measurement Analytical Description Frequency Period Comments <br /> suite'' <br />WGL Weir water sample standard water quality of lower Windy Gulch quarterly 2 years (ID was formerly called <br /> WGWBI <br />Creede water level standard water level in Creede Formation near monthly, assumed to be 2 years well not originally included in <br />Formation 9360 portal continuous Monitoring Plan, <br />Well using data (ID also called HW-31 <br /> to er <br />WGLC charcoal packet tracer lower Windy Gulch charcoal packet, weekly month 1 after tracer will be placed near WGL Weir <br /> cumulative tracer concentration injection <br /> two/month month 2-3 <br />WGLW water sample tracer lower Windy Gulch water sample, weekly month 1 after tracer will be collected near WGL <br /> instantaneous tracer concentration injection Weir, <br /> two/month month 2-3 'monthly sampling must be <br /> monthly month 4-6 continued if tracer detected in <br /> uarterl month 7-24 infiltration trench <br />97000 charcoal packet tracer upper Windy Gulch charcoal packet, weekly month 1 after tracer will be placed in Windy Gulch <br /> cumulative tracer concentration injection near 9700 Weir <br /> two/month month 2-3 <br />9700W water sample tracer upper Windy Gulch water sample, weekly month 1 after tracer will be collected from Windy <br /> instantaneous tracer concentration injection Gulch near 9700m Weir, <br /> two/month month 2-3 'monthly sampling must be <br /> monthly month 4-6 continued if tracer detected in <br /> uarterl month 7-24 infiltration trench <br />TIC charcoal packet tracer trench inlet charcoal packet, weekly month 1 after tracer will be placed at inlet of <br /> cumulative tracer concentration injection infiltration trench if seepage <br /> two/month month 2-3 around lu detected <br />TIW water sample tracer trench inlet water sample, weekly month 1 after tracer will be collected from inlet of <br /> instantaneous tracer concentration injection infiltration trench if seepage <br /> two/month month 2-3 around plug detected, <br /> monthly month 4-6 'monthly sampling must be <br /> quarterly' month 7-24 continued if tracer detected in <br /> infiltration trench <br /> <br />• <br />
The URL can be used to link to this page
Your browser does not support the video tag.