Laserfiche WebLink
~i <br />QUARTERLY SEDIMENTATION POND INSPECTION REPORT <br />CDMR Rufe 4.05.9(17) <br />Mine: New Elk /~ ap' s~ COvr~arNtN~ <br />NPDES ID. No.: None <br />Inspection Period: First Quarter 2006 <br />Inspection Date: 03/25106 <br />Gyre-~neral D~criptron or Refe ace to Site Plan- <br />/ r'+J S / 3 0. Crt~(~ rN C( S{~ bad I ~ ~i~.- /.t OC ~'JM- G/~~/S °~[~ rN~ <br />STira~~e ~vSe.Q 7d"'c~r.Y~K /'tt.N-~f '~.~o,.r. Z)L. Ri~~ ,b[.rt~v~/... <br />S.cd. /f Nrfhw«kJ /2 <br />EMBANKMENT <br />1). Adequacy of the vegetative cover. <br />2). Erosion forming Gullies: <br />Excellent Moderate e~ Poor <br />Extensive Some ~ None <br />3). Is wave action pusing erasion: <br />On the Upstream embankment? <br />Yes <br />4). Erosion of the downstream tce of the embankment? Yes <br />Cause of erosion can be attributed to: <br />5). Is seepage occurting through the dam? Yes <br />Coukt tlris seepage cause potential instabifsty? <br />SEDIMENT STORAGE CAPACRY <br />1). Has the design storage ppacity of the reservoir been surpassed? <br />Yes <br />Explain: <br />OTHER OBSERVATIONS: <br />No ~` <br />No v <br />No~~ <br />No !~ <br />MSHA Qualified Impoundment Inspector <br />3 ~~f O <br />Date <br />