Laserfiche WebLink
_~+' <br />r <br /> <br />QUARTERLY SEDIMENTATION POND INSPECTION REPORT <br />CDMR Rule 4.05.9(17) <br />Mine: New Elk (if/I' #tl ~k`.° <br />NPDES ID. No.: None <br />inspection Period: First Quarter 2006 <br />Inspection Date: 03/25/06 <br />G^e~neral Description or Reference to Site Pian• y~ ,[ /~ ~ <br />iilii C_oN-~~NWtct~" /S o- 17CN-oQtSC.~.V~~NS SLrV.IL`~P~ oCeS(fMe <br />Te Covl`~rK foot-uff -~rw+~ ~..r. Gc.9t51'` ~vr~`~r.C 6r.~rtt*awt+- u./'ec- <br />EMBANI(MENT <br />1). Adequacy of the vegetative cover. <br />2). Erosion forming Gullies: <br />Excellent odes ew Poor <br />Extensive Some Few None <br />3). Is wave action causing erosion: <br />On the Upstream embankment? <br />Yes <br />4). Erosion of the downstream toe of the embankment? Yes <br />Cause of erosion can be attributed to: <br />No ~' <br />No ~' <br />5). Is seepage occurring through the dam? Yes <br />Coukt this seepage cause potential instability`? <br />No~ f~ <br />SEDIMENT STORAGE CAPACffY <br />1). Has the design storage capacity of the reservoir been surpassed? <br />Yes <br />Explain: <br />OTHER OBSERVATIONS: <br />/E~~ 1'' <br />MSHA Qualified impou /ment Inspector <br />Date ~ ~~~ /O b <br />No /~ <br />