Laserfiche WebLink
COAL CO <br />QUARTERLY POND INSPECTION REPORT <br />Inspector Name:_~y ,~cr~~ke Date: 9-2?-9G <br /> <br />Pond Number: / U Date Last Inspection:,2•B•9 L <br />Site Name: CR,Y~/~ - 2 Quarter: ~9/9G <br />1. Design Depth Measured From Spillway Invert ,0 <br />2. Design Maximum Sediment Level Measured Fru,,, Spillway Invert 3./3 <br /> <br />3. Sediment Level/Pond Bottom Measured From Spillway Invert ~,/ <br /> <br />4. Water Level Measured From Spillway Invert ,vo.~~ <br /> <br />5. Discharge Through Spillway Since Last Inspection _ 'Yes ~ No <br />6. Ri 11 s and Gullies 'Yes ~ No <br />7. Vegetation Adequate ~( Yes _ No <br />8. Outlet Channel Erosion Yes X No <br />9. Animal Burrows ..'. Yes a' No <br />10. Cracks Yes K No <br />11. Seepage `Yes X No <br />12. Spillway Clogged _ Yes ~ No <br />13. Valves Operational _LC Yes _ No <br />ADDITIONAL COMMENTS: A/C,yl <br />MAINTENANCE REQUIRED: <br />--~- ~'-off G <br />!, <br />3 <br /> SPI[twAY SNV! <br />- ~,--- - <br /> Y <br />~ <br />h a ~ ~ W <br />~O h~ H J~ <br />