Laserfiche WebLink
Page 3/3 <br /> QUARTERLY POND INSPECTION REPORT <br />Operator: Snowcap Coal Compan Quarter: Third 2007 <br />Permit: C-81-041 Inspection Date: 2SSe 07 <br /> Sewa a La oons <br />Pond Identification Areation Evaporation Evaporation Evaporation <br />Type of Pond Cell 1 Cell 2 Cell 3 Cell 4 <br />Status During Inspectlon: Desi nand Actual De th from S Illwa Invert <br />Design Depth N/A N/A N/A N/A <br />Design Max Water Depth N/A N/A N/A N/A <br />Design Max Sed. Depth N/A N/A N/A N/A <br />Sediment Level N/A N/A N/A N/A <br />ater Level D D Pool Pool <br />OutFlow 0 0 0 0 <br />Features Problem Problem Problem Problem <br /> Yes/No Yes/No Yes/No YesMo <br />Erosional <br />Rills & Gulleys Minor Minor Minor Minor <br />Inadequate Vegetation Yes Yes Yes Yes <br />Outlet Channel Erosion N/A N/A N/A N!A <br />Burrows No Nc No No <br />Other No No No No <br />Structural <br />Differential Settling No No No No <br />Cracks or Slides No No No No <br />Seepage No No No No <br />Other No No No No <br />purtenant Structures <br />Defective Spillways N/A N/A N/A N/A <br />Dewatering Devices Clogged N/A N/A N/A N/A <br />Faulty Gates, Etc. N/A N1A N/A N/A <br />Other No No No No <br />Additional Comments Minor rills noted on the outslopes of the Cells . <br /> Vegetation on Cell outslopes is sparse. <br /> Cell 4 had a pool over 3/4 of its surface. Cell 3 had a pool over half its surface. <br /> ®°p ftEC/S <br />Maintenance Required: Embankment on all Cells needs to be graded to smooth out erosional fe~.,+°F °°S °O <br /> Maintenance on the Cells will be delayed until the sewage treatment s~$te~ijs;' T~ <br /> re-activated. Reclamation will likely occur before the system is activ~t do Q' <br /> e~cY~ ., J.~~O <br />Name of Inspector: Jim Stover • /0 0 <br /> J. E. SiOV~~ <br />°e° <br /> ° <br />~ <br />Colorado P!f~f,}$~~'q~at~ <br />moo a~s <br /> <br />®® <br />9FOa <br />° ~ <br />.• <br />A ~ <br />:tea <br />a e <br />W4 <br />9 ~B <br />~s0 <br />