Laserfiche WebLink
QUARTERLY SEDIMENTATION POND INSPECTION REPORT <br />CDMR Rule 4.05.9(17) <br />Mine: Lorencito <br />NPDES ID. No.: <br />Inspection Period: <br />Inspection Date: <br />Pond #10A-Loadout <br />1ST Quarter 2005 <br />3/28/05 <br />General Description or Reference to Site Plan: <br />This pond is located east of the coal loadout facility and south of the railroad tracks <br />The pond is partially incised into alluvium and the embankment keyed into the <br />subsurtace strata. Side sopes are less than 2H:1 V. The pond discharges into Lorencito <br />Canyon Creek. <br />EMBANKMENT <br />1). Adequacy of the vegetative cover: <br />2). Erosion forming Gullies: <br />3). Is wave action causing erosion: <br />On the Upstream embankment? <br />At the principal spillway inlet? <br />Yes <br />Yes <br />4). Erosion of the downstream toe of the embankment? Yes <br />Cause of erosion can be attributed to: <br />No (/ <br />No (~ <br />No ~~ <br />5). Is seepage occurcing through the dam? Yes <br />Could this seepage cause potential instability? <br />No / <br />PRINCIPAL SPILLWAY <br />1). Is the principal spillway system in working order? <br />2). Is the inlet free of debris and restrictive material? <br />3). Is the discharge outlet free of restrictive material? <br />4). Is erosion occurring al the discharge outlet? <br />Evaluate the severity: Extensive Moderate <br />Excellent Moderate ,F/ew "Poor ~ <br />Extensive Some /Feva~ None <br />Yes ri No <br />Yes v No <br />Yes c~ No <br />Yes Na i/ <br />Just starling None <br />Page 1 of 2 <br />