Laserfiche WebLink
QUARTERLY SEDIMENTATION POND INSPECTION REPORT <br />CDMR Rule 4.05.9(17) <br />Mine: Lorencito <br />NPDES ID. No.: Pond #9A S~~• <br />Inspection Period: 1ST Quarter 2005 <br />Inspection Date: 3/28/05 <br />General Description or Reference to Site Plan: <br />This pond is located south-east of the area of mining scheduled for 2001-02. The pond <br />is partially incised into bedrock and the embankment keyed into bedrock. Side slopes <br />are less than 2H:1 V. The primary spillway discharges south into Jeff Canyon. <br />EMBANKMENT <br />1). Adequacy of the vegetative cover: Excellent i~dera~ Few Poor <br />2). Erosion forming Gullies: Extensive S~~ome,- ~ w l None <br />3). Is wave action causing erosion: <br />On the Upstream embankment? Yes No [/ <br />At the principal spillway inlet? Yes No ~=' <br />4). Erosion of the downstream toe of the embankment? Yes No ~` <br />Cause of erosion can be attributed to: <br />5). Is seepage occurring through the dam? Yes <br />Could this seepage cause potential instability? <br />No 7j <br />PRINCIPAL SPILLWAY <br />1). Is the principal spillway system in working order? <br />2). Is the inlet free of debris and restrictive material? <br />3). Is the discharge outlet free of restrictive material? <br />4). Is erosion occurring at the discharge outlet? <br />Evacuate the severity: Extensive Moderate <br />Yes (i No <br />Yes v No <br />Yes r/ No <br />Yes No (/ <br />Just starting None <br />Page 1 of 2 <br />