Laserfiche WebLink
RECHARGE PROTOCOL <br />Division of Water Resources <br />Division One -Greeley <br />1. The purpose d a'tediarge strkrclure' as referer-oed In this document is to <br />introduce water to the river atluvium Chat wi0 result in aoaedons to a live stream. <br />For the purposes of this document, a recriarge strukture does rwt include a well <br />that is used to artifidaly recharge a Demrer Basin bedrock aquifer. WNh that <br />qualfication, a recharge structure is defined as: <br />a. A ser5iorr d ditch, the bases from whkh can be reasonably characterized <br />by an average SDF value. <br />b. A pond or group of ponds that receive water from the same delivery <br />bcatron and can reasonaby be assigned a single SDF value. <br />2. A mitten notificatlorr for each recharge strukxura must !re provided to the water <br />oommissbrxjr and division engineer. The Division of Water Resources will <br />not acknowledge any recharge aetlvily conducted either prior to our <br />knowledge of its existence or whkh cannot be corroborated with data by <br />the water commiaslonar. The ratification moat include: <br />a, the sedlon, township and range d the strucure (STR). <br />b. the distances of the strucxure from the sedlon lines. <br />c. if the diversion point for the recharge structure is not located in the vidnity <br />d the recharge site, oleo also provide the STR and distances from <br />section 11nes d the metered diversion point. <br />d. for ditch structures, identity the location d the diversion structure. !f the <br />ditch is divided into more Urarr one rek~arge reach, explain trove the <br />volume diverted will be allocated to the various sedlons. <br />e. the maximum water surtaoe area of the structure. <br />3. Upon receiving written ratificatiork, the Division of Water Resources will assign <br />the stnrdure a WDID number. The WDf4 number is the identiflcatfon number <br />that will txe used for the adminbtration of the structure and must be included In all <br />correspondence and accounting reports. (any structure specHically ldemleed <br />by 8TR and distances from section Imes in a Wafer Court application Tor <br />water rlghta or plan for augmerrtatlon will be considered to have met the <br />written notfftcatlon requirements. Fa structures that were conceptualy <br />Included In a decreed plan for augmentation but wero not physically <br />constructed at the time M the decree, a wrflten notlfleation oT the Intent to <br />co,ratn,ct the struderre must be provided.) <br />4. Any stn.icture that intercepts groundwater must be permitted as a well and <br />included in a plan for augmentation or substitute water supply Plan approved by <br />the State Engineer. The Division d Water Resources strongly reowmrends <br />avotdtng recharge sWdures that Intercept groundwater, in order tp simplify fire <br />accounting process. <br />Recharge Protocol, Revs ~anuarv 28. 2005 <br />