Laserfiche WebLink
RERR COAL COMPANY <br />RERR MINE <br />QUARTERLY SEDIMENTATION POND INSPECTION REPORT <br />Pond A <br />Date 6-30-05 <br />1. Water Level (above or below dewatering orifice) Above_ Below X 0.3 Ft <br />2. Sediment Level [below dewatering orifice (designed sediment level) 3.5 Ft <br />3. Sediment Removal Required Yes No <br />4. Outflow (depth of flow in weir) <br />5. Outflow <br />0 Ft <br />0 CFS <br /> PROBLEM <br />FEATURES <br />YES <br />NO COMMENTS <br />EROSION: <br />Rills & Gullies on Embankments <br />X <br />Wave EroSi on X <br />Spillway Erosion X <br />Burrows X <br />Others X <br /> <br />STRUCTURAL: <br />Differential Settling <br />X <br />Cracks or Slides X <br />Seepage X <br />Other X <br /> <br />STRUCTURES: <br />Principal Spillway <br />Clogged Orifice <br /> <br />X <br />Clogged or Damaged Culvert X <br />Weir X <br />Emergency Spillway <br />Erosion <br />X <br />Riprap X <br /> <br />MAINTENANCE REQUIRED: None. <br />MAINTENANCE PEREORMED: None. <br />ADDITIONAL COMMENTS: None. <br />NAME OF INSPECTOR d <br />