My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
HYDRO31425
DRMS
>
Back File Migration
>
Hydrology
>
HYDRO31425
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 8:55:07 PM
Creation date
11/21/2007 1:45:04 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1982055
IBM Index Class Name
Hydrology
Doc Date
5/15/2003
Doc Name
4th Quarter 2002 Sedimentation Pond Inspection Report
From
Peak Project Management LLC
To
Energy Fuels Coal Inc
Permit Index Doc Type
Sediment Pond Inspections
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
4
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
RECEIVED <br />!~":: ';' 15 2003 <br />L,;,,.., _. ..o~ic. sis and Geolo9Y <br />Peak Project Management, LLC <br />3800 County Road 63.9 <br />Trinidad, Colorado 81082 <br />(719) 846-4975 <br />December 31, 2002 <br />Mr. George Patterson <br />Energy Fuels Coal, Inc. <br />P. O. Box 459 <br />Florence, CO 81226 <br />Re: Raton Creek Mine <br />Quarterly Sediment Pond Inspection <br />Certification of Quarterly Inspection <br />Dear George: <br />On December 3l, 2002, the sediment control pond at Raton Creek was inspected for structural integrity, <br />erosion, hazardous conditions, and to identify required maintenance. The inspection also satisfies Rule <br />4.05.9 (13) of the Colorado Mined Land Reclamation Boazd for Coal Mining. <br />To the best of my knowledge, based upon my field observations and investigations, as detailed in the <br />attached inspections report, the referenced pond is being maintained in conformance with prudent, state-of- <br />the-art earthen embankment construction. [[ is recommended that a survey be conducted to determine if, <br />due to sediment accumulation, pond capacity complies with design requirements. This should be <br />completed prior to the next quarterly inspection. <br />/SiNnperety, <br />RO/nal~~ p~~ <br />MSHA Certified -Impoundment Inspections <br />[ have reviewed these reports and certify that a qualified person under my direction has inspected these <br />ponds. <br />~'' ~a>>~4 kle~ `JiC. McGlothlin, P. E. <br />i v~' 1• ~~d~o~'au~.E~egistrationNo.25832 <br />s;at~a l - <br />") ~. , <br />
The URL can be used to link to this page
Your browser does not support the video tag.