Laserfiche WebLink
`~ ~~ SOMERSET <br />M/ N/ N G C O M P A N Y <br />Substation No. 3 <br />Sediment Pond Certification <br />In accordance with Rule 4.05.6(10), each <br />inspected during construction under the <br />certified after construction by, a <br />professional engineer. Certification of <br />shall be forwarded to the Division <br />construction. <br />sediment pond will be <br />supervision of, and <br />qualified registered <br />the constructed pond <br />immediately following <br />The sediment pond is located in Sec. 11, T. 13S, R. 90W. Details <br />of the pond are show on drawing 5-092, and the pond was <br />inspected during construction under my supervision. To the best <br />of my knowledge and belief, the sediment pond was constructed in <br />accordance with the approved plan, and meets the requirements of <br />the Regulations of the Colorado Mined Land Reclamation Board. <br />rz <br />Thomas =C. `Anders n Da e <br />Colorado Registered <br />Profess2:ona1 Engineer <br />Regist:ra'~on No. 14726 <br />P.O. Box 535 7901 Soulhpark, Suite 202 <br />Somerset, CO 81434 Littleton, Co 80120 <br />(303)929-5122 Fax (303)929-5177 (303)795-0413 Fax (303) 795-1524 <br />