Laserfiche WebLink
<br />PART I <br />Page [; <br />Permit No. COG-850000 <br />B. EFFLUENT LIMITATIONS AND MONITORING REQUIREMENTS <br />1. Effluent Limitations (continued) <br />a) Active Mining Oucfall(s) (continued) <br />ALTERNATE LIMITATIONS <br />Any discharge or increase in the volume of a discharge caused by <br />precipitation within any 24-hour period less than or equal to the <br />10-year. 24-hour DreciDitacion event (or snowmelt of equivalent <br />volume) may comply with the following limitations subject to <br />burden of proof requirements described in Part I.B. 1. d). <br />Effluent Parameter <br />Discharge Limitations <br />Maximum Concentration <br />Daily Maximum <br />Flow, MGD Report <br />pH, standard units (minimum-maximum) 6.5-9.0 <br />Oil and Grease, mg/1 (No visible sheen) 10 e/ <br />Settleable Solids, ml/1 g/ 0.5 <br />Total Dissolved Solids, mg/1 Report <br />(Colorado River Basin Only) <br />Total Phosphorus (as P), mg/i Report <br />(Dillon Reservoir and Upper Bear Creek Drainages Orly) <br />Any discharge or increase in the volume of a discharge caused Sy <br />precipitation within any 24-hour period greater than the 10-year. <br />24-hour Drecioitation event (or.snowmelt of equivalent volume) <br />may comply with the following limitations subject to burden of <br />proof requirements describd in Part I.B.l.d). <br />Flow, MGD - monitoring only per Part I.B.2.a) <br />pH shall remain between 6.5 and 9.0 s.u. <br />Oil and grease shall not exceed 10 mg/1. <br />Total Dissolved Solids, mg/l - monitoring only per Parc I.3.2.a) <br />(Colorado River Basin Only) <br />Total Phosphorus (as P), mg/1 - monitoring only per Part I.B.2.a) <br />(Dillon Reservoir and Upper Bear Creek Drainages Only) <br />b) Post-Mining Outfall(s) <br />Post-mining limitations may apply to outfalls serving surface <br />areas which have been returned to the required contour and on <br />which revegetation (specifically, seeding or planting) work ;gas <br />commenced. The permictee may request consideration for change <br />from active mining limitations to post-mining limitations when <br />these conditions have been me c. Each facility certification <br />shall state .rhecher act:~e wining or oast-mining limitations <br />aDD ly co each au chori_ed oucfall. <br />gee ?art ?-3-i. for -oocnoces <br />