Laserfiche WebLink
1z~,-7e <br />F,. On Jl:]rch 21.,1974, in Case .do, ld-7.1'l5, the 4Jater.Raferea for l7at~r <br />U.i~iicic,c: tiv. 5 a-.ra:rrac'~! to ,.... Ri-.'^r:l,r:nd Idel.ls iJO:;. 1,2,3,••":,an'? Vii, <br />corr'3itional water right for 0.67 cubic fool- d.¢r water per seco~]d <br />of time for each well, will] the total annual production limited to <br />340 acre feet, l-o be used for municipal, (including commercial, <br />Indus*_riai, domestic, irrigation incidental t~reto and sewage <br />tri:3 loco t) , irr igatlon, .r,rc:r cation, Sl.Sh arlCl W.l.ldllr. (, prr);,7QAtl.On, <br />and all other beneficial purposes, including storage for each of <br />the above purposes, witl] appropriation dates of June 1,1.973. The <br />Cla.i.mrlu'.' c•+:xs <?i,:u~.t~;l to fi.l•a an application for nuadrenn.ial <br />findi.ny of rCZS!+n:rblr, dil.t~:J'.nco in ±'he d•~velopmcr:!: o;: tlv.:: cr.>!]- <br />ditional realer r:i~rht i.n 2',a'ch o.E .1.978 t_o mai.ntain th:: coacli.ti.onal <br />watt:•c right :i.n full force :•.rrd e~i~ ct. '.i'i]is ruling u. tha ;:.efcrc~t <br />was confi rnred and made a Decree of tl]e Court on July 23,1`174. <br />7. On ilarch 24,1978, the c1ai;~rant filed, in water Court for dater. <br />J?iy;.s.io:r ?i•.~. 5, an applic~t.ion Pot' quadrennial. fi ndin-l of reason- <br />ablc: diligence and to make absillu~e a conditional ~.r.rtcr ri.yht <br />in w1]ich it is requested that O: h4~cubic foot'of water per second <br />of time of that previously a;rarded to Riverbend ;dell !]o. 3 be made <br />ab:,oluL-i: ay;j un:;o:rdition 1 '.~~ r.-: ~snn of i:he application oP that <br />amount of crater to beneficial use. The claimant furt.har <br />requested that a finding of reasonable diligencz be made as to <br />the remaining 0,7.; cubic Prot of water per second of time pre- <br />viously awarded conditionully to Riverbend Ri.verhend ;dell ido. 3, <br />and that findings of reascnable diligence be made as to P.iver- <br />bend P7e11 Ato. 1, Riverbend 17e11 ido. 2, Riverbend Tdell Tdo.4, and <br />Riverbend :'7e11 ido. 5. <br />In support of these requests the following information was submitted <br />by the applicant: ~ <br />(a) Applicant has drilled and cased all five crells. The two <br />main wells have stainless steel scre~::ns :in t:rlled .in them. <br />(b) Applicant has expended $20,011 for e:<cavation of wl]ich <br />approximately $1.6,000 i., all.ocable~ to the wells. The total price include; <br />6,000 feet of water lines, 1,400 feet of sewer lines, settling pond:; and <br />gravel. <br />(c) Applicant I]as installed r•;ater pipes, valves, hydrants <br />and culverts at a total cost of $28,200. <br />(d) Applicant has spent $17,500 for water storage tanks, pumps <br />and valves. habor for installation of the pipes, valves, cuilection syste:rrs <br />survey coordination and lot stakir+.g cost $17,309. <br />(e) Applicant expended $3,931 for concrete foundations, p.r. <br />valves and stops, andsacldles. <br />~v7L9,tND G~/a~~ Ns. ~ <br />(f) Applicant currently has _ "-- ~"- pumping and is <br />applying the water to beneficial use through the storage and mater supply <br />system applicant has constructed. Said well has a 2.00 g.p.m. p;:mn a.nd 1]el:; <br />p,,.mped aL- that rate. Applicant therefore seels to ma?;e absolute. 200 g.p.m. <br />of t}]e conditional decree. <br />(q) Water frm~ said 200 g.p.m. well was first applied to <br />benefic.ia.l use oa Decamber 30,1970. <br />The Referee does therefore conclude that the above entitled anpl.icec.i.c <br />ahould be granted and that 0.44 cubic foot of crater per. second o.f time o` <br />that previously ac•;a.rdecl conditionally to the Riverbend :dells be made absolu~ <br />ant unconditional. <br />The Referee doe:; further find thrrt the claimant has exerc.is:~d reason- <br />able dili•7nnce in the d welopment of th~• remaining 0.23 cubic foot oP water <br />per second of time previously acrsrded conditionally to .Riverbend :d~11 P:o. 3 <br />and <br />-2- <br />