Laserfiche WebLink
Water Sediment Total <br />East Sump - A-F 0.80 N/A 0.80 <br />West Sump - A-F 0.32 N/A 0.32 <br />The sewage lagoons located at the unit train loadout consist of an aeration lagoon and <br />a series of three non-discharging lagoons. During the inspection, the first lagoon was <br />dry and the second and third lagoons (cells 3 & 4) contained some water. The capacity <br />of the lagoons is not considered important and is therefore not presented. The lagoons <br />are inactive. The embankment on all of the lagoons needs to be graded to smooth out <br />erosional features. Plans are to delay maintenance of the embankments until the <br />sewage treatment system is re-activated. <br />To the best of my knowledge and belief and except an noted above, the impoundments <br />have been maintained as d ~' in accordance with the approved plan and <br />applicable regulations. e°RP•••••••.~sT• <br />e~°•S E S°.``90 <br />i~ ~.' ~`~ ~D~; Fos <br />1 o Q Cn ~_ • ,/ <br />~*: Q °~i '04 ~T <br />' ° es E. Stoves Qe Date <br />CoR~tfq Profe~s~i>?~f~ Engineer <br />-4- <br />