My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
HYDRO31322
DRMS
>
Back File Migration
>
Hydrology
>
HYDRO31322
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 8:55:04 PM
Creation date
11/21/2007 1:32:18 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1980001
IBM Index Class Name
Hydrology
Doc Date
6/6/2007
Doc Name
Authorization to Discharge Under the Colo Discharge Permit System
From
Department of Health Department
To
DRMS
Permit Index Doc Type
NPDES
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
57
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Permit No. CO-0032638 <br />Page IS <br />iv) The level established by the Division in accordance with 40 C.F.R. § 122.44(f). <br />b. That any activity has occurred or will occur which would result hm any discharge, on anon-routine or infrequent basis, of <br />a toxic pollutant which is not limited in the permit, if that discharge will exceed the highest of the following "notification <br />levels": <br />i) Five hundred micrograms pet liter (500 ug/1); <br />ii) One milligram per titer (1 mg/1) for antimony; and <br />iii) Ten (10) times the maximum concentration value reported for that pollutant in the permit application. <br />iv) The level established by the Division in accordance with 40 C.F.R. § 122.44(f). <br />6. Bvaass Notification <br />If the permittee knows in advance of the need for a bypass, a notice shall be submitted, at least ten days before the date of the <br />bypass, to the Division. The bypass shall be subject to Division approval and limitations imposed by the Division. Violations <br />of requirements imposed by [he Division will constitute a violation of [his permit. <br />7. Uasets <br />a. Effect of an Upset <br />An upset constitutes an affirmative defense to an action brought for noncompliance with permit effluent limitations if the <br />requirements of paragraph (b) of this section are met. No determination made during administrative review of claims that <br />noncompliance was caused by upset, and before an action for noncompliance, is final administrative action subject to <br />judicial review. <br />b. Conditions Necessary for a Demonstration of Upset <br />A permittee who wishes to establish the affirmative defense of upset shall demonstrate through properly signed <br />contemporaneous operating logs, or other relevant evidence that: <br />i) An upset occurred and that [he permittee can identify the specific cause(s) of the upset; and <br />ii) The permitted facility was at the time being properly operated and maintained; and <br />iii) The permittee submitted proper notice of the upset as required in Part ILA.4. of this pemmit (24-hour notice); and <br />iv) The permittee complied with any remedial measure necessary to minimize or prevent any discharge or sludge use or <br />disposal in violation of this permit which has a reason able likelihood of adversely affecting human health or the <br />environment. <br />In addition to the demonstration required above, a permittee who wishes to establish the affirmative defense of upset for a <br />violation of effluent limitations based upon water quality standards shall also demonstrate through monitoring, modeling <br />or other methods that the relevant stnadazds were achieved in the receiving water. <br />c. Burden of Proof <br />In any enforcement proceeding the permittee seeking to establish the occurrence of an upset has the burden of proof. <br />8. Discharge Point <br />Any discharge to the waters of the State from a point source other than specifically authorized by this permit is prohibited. <br />9. Proper Operation and Maintenance <br />The permittee shall at all times properly operate and maintain all facilities and systems of treatment and control (and related <br />appurtenances) which are installed or used by the permittee as necessary to achieve compliance with the conditions of this <br />permit. Proper operation and maintenance includes effective performance and adequate laboratory and process controls, <br />including appropriate quality assurance procedures. This provision requires the operation of back-up or auxiliary facilities or <br />
The URL can be used to link to this page
Your browser does not support the video tag.