Laserfiche WebLink
Page 3/3 <br /> QUARTERLY POND INSPECTION REPORT <br />Operator: Snowca Coal Com an Quarter: Second 2007 <br />Permit: C-81-041 Inspection Date: 27-Jun-07 <br /> Sewage La oons <br />Pond Identification Areation Evaporation Evaporation Evaporation <br />Type of Pond Cetl 1 Cell 2 Cell 3 Cell 4 <br />Status During Inspection: Desi nand Actual De th from S Illwa Invert <br />Design Depth N/A N/A N/A N/A <br />Design Max Water Depth N/A N/A N/A N/A <br />Design Max Sed. Depth N/A N/A N/A N!A <br />Sediment Level N/A N/A N/A N/A <br />ater Level D D Pool Pool <br />Outflow 0 0 0 0 <br />Features Problem Problem Problem Problem <br /> Yes/No YesMo Yes/No Yes/No <br />Erosional <br />Rills & Gulleys Minar Minor Minor Minor <br />Inadequate Vegetation Yes Yes Yes Yes <br />Outlet Channel Erosion N/A N/A N/A N/A <br />Burrows No No No No <br />Other No No No No <br />Structural <br />Differential Settling No No No No <br />Cracks or Slides No No No No <br />Seepage No No No No <br />Other No No No No <br />Appurtenant Structures <br />Defective Spillways N/A N/A N/A N/A <br />Dewatering Devices Clogged N/A N/A N/A N/A <br />Faulty Gates, Etc. N/A N/A N/A N/A <br />Other No No No No <br />dditional Comments Minor rills noted on the outslopes of the Cells . <br /> Vegetation on Cell outslopes is sparse. <br /> All cells were dry. <br /> 000® E~~S <br />R <br />Maintenance Required: Embankment on all Cells needs to be graded to smooth out erosional fees'°E ° ST° <br /> Maintenance on the Cells will be delayed until the sewage treatment s~~~ _ O <br /> re-activated. Reclamation will likely occur before the system is activ~4ede~ <br /> 19230 <br />O~ri <br />Name of Inspector: Jim Stover aA ~ ~ ' "I - ~ ~" <br /> J. E. StoveP~r. °° <br />°° <br /> • °. , <br />Colorado P <br />~ <br />P~ <br /> . <br />A <br />•.nais <br />'o <br />~9~,® <br />s <br />°O~ <br />pe~i <br />° ~ <br />m ~0 <br />0°~~0 <br />,~0~ <br />