My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
HYDRO31308
DRMS
>
Back File Migration
>
Hydrology
>
HYDRO31308
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 8:55:04 PM
Creation date
11/21/2007 1:29:53 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981010
IBM Index Class Name
Hydrology
Doc Date
10/16/1987
Doc Name
DAM CONSTRUCTION CERTIFICATION
Permit Index Doc Type
PROF POND CERTIFICATIONS
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
9
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />Trapper Mining Inc. <br />Craig, Colorado <br />DAM CONSTRUCTION CERTIFICATION <br />I, Collin R. Fay, a Registered Professional Engineer in the State of Colorado, in ac- <br />cordance with 2 CCR 407-2, Section 4.05.6(7), certify that Johnson Dam No. 7R, lo- <br />cated in Section 27, T 6 N, R 91 W, 6th PM, was inspected by me during construc- <br />tion. This reconstruction of Johnson Dam No. 7 was begun on June 4, 1987, and <br />completed on September 12, 1987. I certify that the embankment and spillway were <br />built as designed and the resulting Johnson sedimentation system will perform equally <br />as well or better than the system previously in place. One minor modification, reloca- <br />tion of the spillway from the east side of the embankment to the west side of the em- <br />bankment, was made during construction. This modification, authorized by me, was <br />made to accomodate field conditions and did not alter the hydrologic characteristics <br />of the resulting sedimentation pond. <br />During construction, this dam was visually inspected daily to insure compliance with <br />prudent construction methods. Compaction was accomplished by laying fill material <br />in thin horizontal layers and compacting with a vibratory roller compactor, a dozer, <br />and/or scrapers. Standard Proctor densities were determined in our lab using <br />methods outlined in AASHO Standard Method T99-61. Compacted density and mois- <br />ture content of the placed fill material was monitored using a nuclear density probe to <br />ensure adequate compaction. ///%' ,/ <br />0 <br />pno:~o C r'l/~ ~ c <br />o°E~P~~ P°=~~spo <br />c°~v~.~~\CHARpfo°F,~o ~ ~.' <br />o goy 2~ o~ Collin R. Fay, Colorado P No. 22438 <br />ciroU 22~~8 nab; <br />p• 4 <br />o? ° o QO <br />°o °. ° ~.o ~croaF-~ /~, /987 <br />°o~,r''°°..°°°°°°~~~o° Date <br />°~o0p(1t E\oG <br />o~~,no <br />
The URL can be used to link to this page
Your browser does not support the video tag.