Laserfiche WebLink
RELATIVE COMPACTION TEST RESULTS <br />PROJECT. Bowie //2 Sediment Pond "B" PROJECT N0: M00104MT DATE: llednesday 5-31-00 <br />LOClITION:Bowie, CO ENGINEERING TECHNICIAN: Casias <br />CtIENl Bowie Resources <br /> DEPTH PROBE PROCTOR UIS+~~~ DRY OISTURE P.ELaTIVE <br />TEST <br />No. to[nr10N OR <br />ELEV.. DEPTH <br />(1N) DENSITY <br />(PCF) 1f <br />CpyT NT <br />(Y~ DENSITY <br />(PCF) CONTErfT <br />(Y) COMPACTION <br />(9) SOIL TrPE <br />1 100' west from east eind of the 7' 6 111.5 13.5 107.8 11.3 97 sand, gravel, clay <br /> south dike elow <br /> op •of <br /> dike <br />2 Midway down the south dike " " 6 111.5 13.5 112.6 13.0 100 " " " <br />3 100' east from west end of south 9' 6 111.5 13.5 108.8 12.8 98 " <br /> dike below <br /> top of <br /> dike <br />REMIIRY,S: TI~~~ ir~i results indic.ilc the density and moisture content fOr the IOCatIOn and <br />clev.il~nn tested only. <br />RILniIVE COMPACEION TEST RESULTS <br /> ~ ~ <br />~l~i~l[~cr~ ~lil~l OCIA~e,~ <br />~,~ <br />,~ <br />