My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
HYDRO31299
DRMS
>
Back File Migration
>
Hydrology
>
HYDRO31299
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 8:55:04 PM
Creation date
11/21/2007 1:29:32 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1980005
IBM Index Class Name
Hydrology
Doc Date
1/26/2004
Doc Name
3rd Q 2003 Stockpond Reports & Annual Inspections
From
Seneca Coal Company
To
DMG
Permit Index Doc Type
Sediment Pond Inspections
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
35
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />PERIODIC INSPECTION FORM <br />Stockponds or Swnps <br />INSPECTOR'S NAME: Rov Karo <br />FACILITY CONFIGURATION: Stockoond <br />SITE NAME: T-13 <br />MINE NAME: Seneca II <br />MINE I.D. NO.: C-80-005 <br />DATE : 8/1j/p <br />DATE LAST INSPECTION: ~/~~/03 <br />LOCATION: NW'1aSE~, Sec 12, TSN, R87W <br />LOCATION: 7.1 mi SE of Hayden, CO <br />OWNER'S REP.: Greco Kitchen <br />Circle or write in appropriate response <br />1. Angle of slope: 3:1 upstream, 3:1 downstream Total = 6:1 N/A <br />2. *Seepage (specify location, color, and approximate volume) <br /> At isolated points on embankment slopes: Yes No N/A <br /> At natural hillside: Yes No N/A <br /> Over widespread areas: Yes No N/A <br /> From downstream foundation~ <br />ea: Yes No N/A <br /> I~ <br />"Boils" beneath stream or ~ehded water: Yes No N/A <br />3. Cracks or scarps on crest: Yes No N/A <br />4. Cracks or scarps on slo ~ <br />~ Yes No N/A <br />5. Sloughing or bulging p <br />n <br />slope: Yes No N/A <br />6. ` <br />*Major erosi p b~mSF Yes No N/A <br />7. Surface move en alley b m or on hillside: Yes No N/A <br />8. *Erosion of toe: Yes No N/A <br />9. *Water impounded g inst dov ream toe: Yes No N/A <br />10. Existing embankment freeboar feet <br />11. Increase Decrease in water level: feet <br />12. Cracks, bulging, or erosion on upstream face: Yes No N/A <br />13. Spillway erosion: Yes No N/A <br />14. *Clogging <br /> Spillway channels: Yes No N/A <br /> Diversion ditches: Yes No N/A <br />*Major adverse changes in these items could cause instability and should be reported to <br />the Engineering Manager and Mine Superintendent for further evaluation. Adverse <br />conditions noted in these items should normally be described (extent, location, volume, <br />etc.) in the space on the back of this sheet. <br />Comments <br />17 <br />
The URL can be used to link to this page
Your browser does not support the video tag.