Laserfiche WebLink
QUARTERLY SEDIMENTATION POND INSPECTION REPORT <br />CDMR Rule 4.05.9(17) <br />Mine: New Elk Pond 6 <br />NPDES ID. No.: <br />Inspection Period: <br />Inspection Date: <br />None <br />Third Quarter 2006 <br />09/30/06 <br />General Description or Reference to Site Plan: <br />Pond 6 is anon-discharging facility designed to contain plant processing water. The plant has <br />been idle since 1996 and the pond is now used to dewater other ponds prior to clean-out. <br />EMBANKMENT <br />1). Adequacy of the vegetative cover: <br />2). Erosion forming Gullies: <br />3). Is wave action causing erosion: <br />On the Upstream embankment? <br />Excellent Moderate ew Poor <br />Extensive Some ~e None <br />Yes <br />4). Erosion of the downsVeam tce of the embankment? Yes <br />Cause of erosion can be attributed to: <br />NO `' <br />No // <br />5). Is seepage occurring through the dam? Yes <br />Could this seepage cause potential instability? <br />SEDIMENT STORAGE CAPACITY <br />1). Has the design storage capacity of the reservoir been surpassed? <br />Yes <br />Explain: <br />OTHER OBS~E~RV_ATIONS: <br />~r1 f / 9,. U ~ , <br />X <br />MSHA Qualified Impoundment I pector <br />No ~~ <br />No ~ <br />9 /30 ~~ ~ <br />Date <br />