Laserfiche WebLink
~' BASIN RESOURCES, INC. <br />SEDIMENTATION POND INSPECTION FORM ~ <br />GOLDEN EAGLE GE_ 002 <br />Pond NPDES No. <br />Date of Inspection q-2~ `l `t <br />EMBANKMENT <br />1. Adequacy of the vegetative cover: Excellent, Moderate, ~ Poor <br />2. Erosion forming gullies: Extensive, Some, Very Few, one <br />3. Is wave action causing erosion: <br />On the upstream embankment? Yea No_~ <br />At the principal spillway inlet? Yee No~_ <br />4. Erosion of the downstream toe of the embankment? Yea No~_ <br />The cause of the erosion is attributed to: <br />5. Is seepage occurring through the dam? Yen No~_ If yes <br />could this seepage cause potential instability? Yea No~_ <br />Explein: <br />PRINCIPAL SPILLMAY <br />1. Is the principal spillway system in working order? Yes~_Ilo <br />2. Is the inlet free of debris and restrictive materi.al?Yea,~_No <br />3. Ia the discharge outlet free of restrictive material? Yes X No` <br />4. is erosion occurring nt the discharge outlet? Yeas No~_If <br />yea, <br />evaluate the severity: Extensive Moderate Juat starting None <br />~~, <br />EMERGENCY SPILLMAY ' <br />1. Is the overall emergency spillway system capeble of passing <br />design storm discharge? Yes~_No <br />2. Does it appear ea if the emergency'spillway has discharged water <br />since the last inspection? Yea No~_ <br />3. Is erosion occurring at any section of the emergency spillway? <br />Yes No_~ Describe the <br />extent <br />SEDIMENT STORAGE CAPACITY <br />1. Haa the design storage capacity of the reservoir bean surpassed? <br />Yea No_~ I! yes, <br />explain: <br />.~. Tt ,._~. wI. F. A. u... __.+ ._ _ .i. F. G_9 T_44 <br />1 <br />.;~. Please add any special cosments concerning potentislly dsngeroua <br />problems on the back of thi• ^heet. <br />I nspactor_1~~~,,,..~i-~ <br />