Laserfiche WebLink
<br /> <br />impoundment criteria of Rule 4.05.9(3), the State Engineer's Office or C.R.S. 37-87- <br />105. <br />The attached inspection sheet covers other items related to the ongoing performance of <br />the pond at the time of the inspection. <br />I certify that the sediment pond at the Rimrock Mine has been constructed according to <br />the plans and is functioning well with Prudent state-of--the-art engineering has been <br />employed and the dam is sound, with no current environmental threats or construction <br />& maintenance problems. <br />~p.~~.....,~ _ <br />~ .~.lf~V C. [c~.9i~ '. <br />-- <br />~i~,l9e <br />