My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
HYDRO31206
DRMS
>
Back File Migration
>
Hydrology
>
HYDRO31206
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 8:54:58 PM
Creation date
11/21/2007 1:22:27 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1984067
IBM Index Class Name
Hydrology
Doc Date
6/24/1992
Doc Name
FINAL PERMIT COLO WASTEWATER DISCHARGE PERMIT SYSTEM CO-G-850007 PEERLESS RESOURCES INC
From
CDOH
To
L DALE LARSEN
Permit Index Doc Type
NPDES
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
22
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
w ~• <br />RE.NE'dAL OF <br />COAL MINING FACILITIES <br />(SURFACE RUNOFF ONLY) <br />GENERAL PERHIT IN COLORADO <br />RATIONALE <br />COLORADO DISCHARGE PERMIT NUMBER COG-850000 <br />I. Update <br />This is the first renewal of the general permit for coal mining facilities <br />;surface runoE~ onlr). The original permit was issued March 8, 1988, and <br />became effective on April 8, 1988. <br />This general permit has been of value both to permictees and the <br />Division. Permittees who qualify are able to secure a permit in a much <br />shorter time than is required for issuance of an individual permit. The <br />Di•rision's permit drafting burden is lessened by the ability co issue <br />certificacie-~.:; to the general permit for qualified facilities. <br />II. Permit Changes <br />SCOrmwater Management Plan - The federal effluent guidelines that govern <br />discharges from coal mining facilities (40 CFR 434) have not changed since <br />the original general permit was issuea. Part 434 controls most surface <br />r+inoff from coal mining facilities chreugh limitations that apply co <br />discharges from sedimentation ponds. This is consistent with regulations <br />implemented by the federal Office of Surface Mining (OSM). In Colorado, <br />the Colorado Mined Land Reclamation Di+~ision (CMLRD) assures compliance <br />with these federal requirements. The Division has determined chat <br />Limitations beyond these are not necessary for such areas. However, these <br />regulations do not address all sources of stormwater from coal mining <br />facilities. Arias such as roads and railroad lines, pond outslopes, <br />_nacti+re loadoucs, sites used for storage and maintenance of material <br />handling eeuipment and areas for which small area exemptions have been <br />granted era not covered by these regulations. <br />The federal stormwater regulations, issued November 15, 1990, impact the <br />subject facilities in some substantial ways. As they apply [o coal mining <br />facil_ties, the stormwater regulations primarily address areas not covered <br />by Part .::=.. Compliance with these reg+iiations may be achieved through. <br />measures of best management practices and pollution prevention. Best <br />management practices (BMP) means schedules of ac[i•ricies, prohibitions of <br />practices, maintenance procedures, and ocher manag_menc practices co <br />prevent or reduce the pollution of the watzrs of the State. <br />
The URL can be used to link to this page
Your browser does not support the video tag.