Laserfiche WebLink
(5) Although there is potential for modification of these standards as a result of demonstrated <br />hydrologic conditions, such modification shall only be made with the consensus of BLM, OSM, State of <br />Colorado, and Kerr (or its agents). If Kerr desires such a modification, a meeting including all these <br />parties is suggested to occur within the next 6 weeks. <br />(6) Any variance from these standazds shall be in writing. <br />Please contact John Morrone at 970-870-6132, or at this office, for any clarification. <br />SinJcerely,) / _ <br />G~-C~l~i ~ `;h,, ~2 <br />Linda M. Gross / <br />Field Manager <br />cc: Colorado Division of Minerals and Geology <br />Attn: Jim Stark <br />1313 Sherman Street <br />Room Z15 <br />Denver, Colorado 80203 <br />US Office of Surface Mining <br />Attn: Henry Austin <br />1999 Broadway, Suite 3320 <br />Denver, Colorado 80202-5733 <br />Montgomery Watson Harza <br />Attn: Jerry Nettleton <br />PO Box 774018 <br />Steamboat Springs, Colorado 80477 <br />