Laserfiche WebLink
<br />impoundment criteria of Rule 4.05.9(3), the State Engineer's Office or C.R.S. 37-87- <br />105. <br />The attached inspection sheet covers other items related to the ongoing performance of <br />the pond at the time of the inspection. <br />I certify that the sediment pond at the Rimrock Mine has been constructed according to <br />the plans and is functioning well and that prudent state-of-the-art engineering has been <br />employed and the dam is sound, with no current environmental threats or construction <br />& maintenance problems. <br />QP~p RE~~tS;~. , <br />o ~oQ,V c. cF~~ 9~a b`~~.~~~c'~C <br />v•~, ~. <br />?' 20336 ~;u <br />FOSS/ONA~~'~ <br />