Laserfiche WebLink
PERIODIC INSPECTION <br />WATER, SEDIMENT, OR SLURRY <br />Inspectors Name: ~ Op ( 1=re~LC <br />NPDES 1D. No.: CO-0000213 001 <br />Facility Configuration: Cross Valley Pond <br />Site Name: Impoundment # 001 <br />Mine Name: New Horizon Mihe Western Fuels-Co <br />Mine ID Na.:CMLRD Permit #0008=81 <br />Owners Rep.: R, L. Wade, .Mine Manager <br />1. <br />2. <br />3. <br />4. <br />5. <br />b. <br />RECEIVED ' `~~` <br />,~::.- . <br />.,., . , <br />FaRn JUN 19 1995 `.:'~',t';'.``- <br />IMPOUNDMENTS <br />Divi/sion of M~p erais.~ Geology . <br />Date: 6 ~J 3 ~i5 <br />Date Last Inspected: J.=/7-~JS <br />Location: 47N16W36BC <br />Location:2 mi. NW of Nucla, Co. <br />CIRCLE OR WRITE IN APPROPRIATE RESPONSE <br />Foundation Preparation (removal of vegetation, stumps, topsoil( es No N/A <br />Lift thickness (inchesl: IZ-rn~•~f~~~No. N/A <br />Compaction according to approved plan: ~y'e3/~ N/A <br />Burning (specify extent and location): es No N/A <br />Angle of slope: 3:1 upstream, 3:1 downstream, Total = b:l <br />Seepage (specify location, color, and approx. volume) <br />From underdrain pipes: <br />At isolated c::nts on embankment slopes: <br />At natural hillside: <br />7 <br />O <br />9 <br />10 <br />11 <br />12 <br />13 <br />14 <br />15 <br />16 <br />17 <br />IB <br />19 <br />Over widespread areas: _ <br />From downstream foundation <br />'Boils" beneath stream or <br />Cracks or scarps on crest: <br />Cracks or s=arps on slope: <br />Sloughing cr bulging on slope:~ <br />*Major erosion problems: <br />Surface movements in valley bottom or on hillside: <br />;Erosion of toe: <br />Water impounded against tae: <br />Existing embankment freeboard (feet): <br />increase or decrease in water <br />Cracks, bulging, or erosion on upstream face:~ <br />Visible sumps or sinkholes in slurry surface:~ <br />+Clagging <br />Spillway channels and pipes: <br />Decant system: _ <br />Diversion ditches: <br />(Cracking or crushing of <br />pipes <br />Spillway pipes: <br />Decant system: <br />20. Trash racks clear and in place: <br />+Major adverse changes to these items <br />to the Chief Engineer and Mine Manage <br />noted in these items should normall~l` <br />on page two mf this inspection forfi. <br />area: <br />ponded water: <br />Yes Na <br />Yes N/A <br />Yes N/A <br />Yes a N/A <br />Yes N/A <br />Yes N/A <br /> <br /> <br /> <br /> <br /> <br />Yes a N/A <br />Yes N!A <br />Yes o N!A <br />Yes o N/A <br />Yes ' No N/A <br />Yes o N/A <br />Yes o N/A <br />13,Z Feet <br />Feet <br />Yes a N/R <br />Yes N/A <br />Yes N/A <br />Yes o N/A <br />Yes N/A <br />Yes ~ N/A <br />~v~ ~ N/A <br />lYes1 Na N/A <br />~p P,EG/S. <br />~d ~~r~~ability and shou..d 6e reported <br />r nation. Adverse conditions <br />escrihq~?~ fit, location, volume, etc.) <br />level (feet):- <br />