My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
HYDRO31153
DRMS
>
Back File Migration
>
Hydrology
>
HYDRO31153
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 8:54:57 PM
Creation date
11/21/2007 1:18:59 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981019
IBM Index Class Name
Hydrology
Doc Date
5/26/1995
Doc Name
RIPRAP LINING ON SECONDARY SPILLWAYS WAREHOUSE POND STREETER POND & GULCH A POND COLOWYO COAL MINE P
From
DMG
To
COLOWYO COAL CO LP
Permit Index Doc Type
CORRESPONDENCE
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
Page 1 of 1
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
1141111111111111111 <br />STATE OF COLORADO <br />DIVISION OE MINERALS AND GEOLOGY <br />Depanmem of Natural Resources <br />1313 Sherman 51., Room 215 ` <br />` <br /> <br />Denver, Colorado 80203 I <br />~ <br />~~ <br />y <br />Phone U03) 866-)567 I I <br />FA%' 13031 832-8106 <br /> DEPARTMENT OF <br /> NATURAL <br /> RESOURCES <br />May 26, 1995 knY Rnme, <br /> Gnverna <br />Mr <br />Juan Garcia lames s `nchhezd <br />. Cxerurwe Diredur <br />Colowyo Coal Company L.P. Michael R L„nti <br />5731 State Highway 13 Drvuinn DVCCIOI <br />Meeker, CO 81641 <br />RE: Riprap Lining on Secondary Spillways, <br />Wazehouse Pond, Streeter Pond, and Gulch A Pond, <br />Colowyo Coal Mine, Permit No. C-81-019. <br />Dear Mr. Garcia: <br />This letter is in response to our phone conversations from 5/25/95 and 5/26/95, during <br />which we discussed the secondary spillway riprap lining for the Warehouse Pond, <br />Streeter Pond, and Gulch A Pond. In my inspection report from 5/16/95, I commented <br />that the secondary spillways appeared stable; however, the material utilized as riprap was <br />either undersized or incompetent in nature and was decomposing. Maintenance of the <br />riprap linings will be necessary to ensure that spillways continue to function as designed. <br />During our conversation from 5/26/95, you stated that your intentions were to replace <br />the weathered material with durable riprap this summer. Your proposal to hold off on <br />riprap replacement until dry weather affords more favorable field conditions is prudent. <br />Please proceed with your maintenance plan as soon as field conditions allow. <br />Please contact me if I can be of further service. <br />Sincerely, <br />Wallace H. Erickson <br />Environmental Protection Specialist <br />
The URL can be used to link to this page
Your browser does not support the video tag.