My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2006-08-24_HYDROLOGY - M2002052
DRMS
>
Day Forward
>
Hydrology
>
Minerals
>
M2002052
>
2006-08-24_HYDROLOGY - M2002052
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/25/2023 9:56:07 AM
Creation date
11/21/2007 1:18:53 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M2002052
IBM Index Class Name
Hydrology
Doc Date
8/24/2006
Doc Name
Substitute Water Supply Plan
From
OSE
To
Western Equipment & Truck Inc.
Permit Index Doc Type
Correspondence
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
9
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Mr. Bob Condon <br />Two Rivers Rock Pit (M-03-052) <br />August 22, 2006 <br />Page 3 <br />5. Total consumptive use of the mining operation shall not exceed 1.92 acre-feet for dust <br />control and 9.25 acre-feet of water lost with the mined aggregate. <br />6. Total consumption at the pit(s) must not exceed these aforementioned amounts unless an <br />amendment is made to this plan. <br />7. Approval of this plan is for the purpose as stated herein. Any additional uses for which the <br />water may be used must first be approved by this office. <br />8. Alt pumping fordust control purposes shall be measured in a manneracceptable to <br />the division engineer. <br />9. The replacement water that is the subject of this plan cannot be sold or leased to any other <br />entity. As a condition of subsequent renewals of this substitute water supply plan, the <br />replacement water must be appurtenant to this site until a plan for augmentation is obtained. <br />A copy of this approval letter should be recorded with the county clerk and recorder. All <br />replacement water must be concurrent with depletions in quantity, timing and locations. <br />10. The name, address and phone number of the contact person who will be responsible forthe <br />operation and accounting of this plan must be provided with the accounting form to the <br />division engineer and water commissioner. <br />11. Adequate accounting of depletions and replacement must be provided to the division engineer <br />in Greeley and the water commissioner on a monthly basis or other interval acceptable to both <br />of them. The Applicant is also required to provide an annual report of monthly water use to <br />endure than sufficientwaterto coverthe pit depletions was released from the Town of Milliken. <br />All amounts shall be in acre-feet. <br />12. In addition, the Applicant shall submit a report from each entity making replacements using <br />recharge accretions; for this plan, that entity is the Town of Milliken. The reportshall include an <br />accounting of all recharge accretions controlled by each entity, showing the total volume of <br />water under its control at the various recharge sites, and the amount committed to each of the <br />recipients of the water. <br />13. This substitute water supply plan may be revoked or modified at any time should it be <br />determined that injury to other vested water rights has or will occur as a result of this plan. <br />Should this supply plan expire without renewal or be revoked prior to adjudication of a <br />permanent plan for augmentation, all use of ground water under this plan must cease <br />immediately. <br />14. In accordance with amendments to §25-8-202(7), C.R.S., and "Senate Bill 89-181 Rules and <br />Regulations' adopted on February 4, 1992, the State Engineer shall determine whether the <br />substitute supply is of a quality to meet requirements of use to senior appropriators. As <br />such, water quality data or analysis maybe requested at any time to determine if the water <br />quality is appropriate for downstream water users. <br />
The URL can be used to link to this page
Your browser does not support the video tag.