Laserfiche WebLink
Page 3/3 <br />Identification <br />of Pond <br />s During Inspection: <br />in Depth <br />!n Max Water Depth <br />in Max Sed. Depth <br />lent Level <br />Level <br />QUARTERLY POND INSPECTION REPORT <br />Snowca Coal Com an Quarter: First 2005 <br />C-81-041 Inspection Date: 11-Mar-05 <br />Sewaoe Lagoons <br />Areation Eva ration Eva ration Eva ration <br />Cell 1 Cell 2 Cella Cell o <br />N/A N/A N/A N/A <br />N/A N/A N/A N/A <br />N/A N/A N/A N/A <br />NIA N/A N7A N/A <br />Drv Drv 3-6" Pool 3-6" Pool <br /> Yes/No YesMo Yes/No YesMo <br />Erosional <br />Rills & Gulleys Minor Minor Minor Minor <br />Inadequate Vegetation Yes Yes Yes Yes <br />Outlet Channel Erosion N/A N/A N/A N/A <br />Burrows No No No No <br />Other No No No Na <br />Structural <br />Differential Settling <br />Cracks or Slides <br />Seepage <br />No <br />No <br />No <br />No <br />No <br />No <br />No <br />No <br />No <br />No <br />No <br />No <br />~purtenant Structures <br />Defective Spillways N/A N/A N/A N/A <br />Dewatering Devices Clogged N/A N/A N/A N/A <br />Faulty Gates, Etc. ~ N/A N/A N/A _ N/A <br />onal Comments Minor rills noted on the outslopes of the Cells. <br />Vegetation on Cell outslopes is sparse. <br />The bottom of the fourth cell was covered with ice. <br />mance Required: Embankment on all Cells needs to be graded to smooth out erosional features. <br />Maintenance on the Cells will be delayed until the sewage treat ®~ ~ v. ~ i~, <br />re-activated. Reclamation will likely occur before the system ~3g~tiVated'°~"~ <br />e' L <br />• ga S J r <br />4V a~- <br />oflnspector. Jim Stover • 5~~ <br />• ,~lorado P. E. <br />ern °a. <br /> <br />'C~r~afQ~4 ~ <br />