Laserfiche WebLink
~~ <br />III IIIIIIIIIIIIIIII <br />QUARTERLY POND INSPECTION REPORT <br />OPERATOR: HONEYWOOD COAL CO. QUARTER: FOURTH QUARTER 1993 <br />INE: HAMILTON MINE DATE OF INSPECTION: JANUARY 6, 1994 <br />POND IDENTIFICATION A B <br />YPE OF POND SEDIMENT SEDIMENT <br />STATUS DURING INSPECTION: <br />PPROXIMATE WATER LEVEL DRY DRY <br />SED (~ total storage) 0~ 0~ <br />UTFLOW (cfs) 0 0 <br />FEATURES PROBLEM PROBLEM COMMENTS <br />EROSIONAL: YES NO YES NO <br />Rills & Gulleys X X <br />Inadequate Vegetation X X SEE NOTE BELOW <br />Outlet Channel Erosion X X <br />Burrows X X <br />Other X X <br />TRUCTURAL: <br />Differential Settling X X <br />Cracks or Slides X X <br />Seepage X X <br />Other X X <br />PPURTENANT STRUCTURES: <br />Defective Spillways X X <br />Dewater Device Clogged X X <br />Faulty Gates, Etc. X X <br />Other X X <br />DDITIONAL COMMENTS: Ponds were built during the first quarter of 1992. <br />Seeding of the pond embankments wi ll occur during the fall of 1993. <br />INTENANCE REQUIRED: Rills noted in the third quarter report were <br />repaired du ring the quarter. <br />STORM WATER MANAGEMENT PLAN: The s ilt fences along the haul road were <br />in go od shape. <br />AME OF INSPECTOR: Kirt J tykes ~ ~! ~-i°._~~ <br /> J. E. Stover <br /> Colorado P.E. 19230 <br />