Laserfiche WebLink
STONE Ff WEBSTER EN6INEERINQ~ CORPORATION <br />® P. O. BOX 1409, RANGELY. COLORADO 81646 <br />.p.TpN RECEIVED <br />nEw YORK ar ^.. <br />CHERRY MILL. N J. <br />OFNV[R ~ Pn ~Q ~ ~ ' <br />LHICROO ( l~l <br />MORTLANU. Ofl E00H <br />"°""°" JAN 2 61983 <br />WAI NINOTON, p. C. <br />Mr. Tom C. Caruso <br />Project Engineer <br />Western PUels -Utah, inc. <br />P.O. Box 158y <br />Rangely, CO 81648 <br />llear Mr. Caruso: <br />MAD LAND RECLAMATION <br />COLD, DEPT. OF NATURAL RESOURCES <br />January 11, 1983 <br />BONANZA POWER PROJECT <br />COAL TRANSPORTATION SYSTEM <br />WESTERN FUELS -UTAH, INC. <br />RAILROAD LOADOUT LOOP SIDIMENTATlON POND <br />We wish to advise that the design criteria for the sedimentation pond in the <br />rail car loadout loop situated in Rio Blanco County in the S'~ NW4f Section <br />22, T3N, R101W is in accordance with the attached exhibit "A" titled Railroad <br />Loadout Loop Sedimentation Pond. <br />The sedimentation pond was constructed in accordance with construction draw- <br />ings No. 13617.01-EY-11BY-8 and 13617.01-EY-11CP-2 which show the location and <br />details f'or said installation. <br />Very truly yours <br />~P ~~~ <br />R. P. Wynn, P.E. <br />Supt. of Construction <br />RPW:wm <br />att. <br />