Laserfiche WebLink
January 28, 2002 <br />Page 5 of 8 Pages <br />4ih Quarter 1999, submitted January 8. 2001, received at [he Division January 10, 2001 <br />Pond and Was the Was the Was the Is the report Is the Is required <br />Date of pond pond pond certified by sediment maintenance <br />Inspection inspected inspected inspected aregistered level reported? <br /> for for for other engineer? reported? <br /> structural erosion? hazardous <br /> weakness? conditions? <br />Pond B, Yes yes Yes No. Signed Yes, <5~5 Yes (none) <br />10/14/99 by Rick <br /> Mills <br />Pond C, Yes yes Yes No. Signed Yes, ]5- Yes. Clean <br />10/14/99 by Rick 20% out sediment <br /> Mills at west end <br /> of ond. <br />Pond D, Yes yes Yes No. Signed Yes, ~0- Yes. Pond to <br />10/14/99 by Rick 60% be dredged <br /> Mills <br />Pond E, Yes yes Yes No. Signed Yes, 5- Yes, clean <br />10/14/99 by Rick 10°l0 out <br /> Mills vegetation <br /> around riser. <br />Pond F, Yes yes Yes No. Signed Yes, 5- Yes (none) <br />11/14/99 by Rick 10% <br /> Mills <br />Pond FCT, Yes yes Yes No. Signed Yes, Yes (none) <br />10/14/99 by Rick <]0% <br /> Mills <br />Pond G, Yes yes Yes No. Signed Yes. 5- Yes (none) <br />10/14/99 by Rick 10% <br /> Mills <br />Pond T, Yes yes Yes No. Signed Yes, < Yes. <br />10/14/99 by Rick ]0% Vegetation <br /> Mills needed to be <br /> cleaned out <br /> around the <br /> riser. <br />Pond 1 15 Yes yes Yes No. Signed Yes, <5% Yes. (none). <br />FCBH, by Rick However, <br />10/14/99 Mills suggestions <br /> were made <br />