Laserfiche WebLink
ENEC <br />S ~~ RECEIVED Seneca Coal Company <br />}tJl. 2 6 2004 <br />pivisi•n of Minerals and Geulog7 <br />July 15, 2004 <br />RE: Seneca II-W Mine (C-82-057) Quarterly Stockpond Inspections <br />Mr. Daniel Mathews <br />Division of Minerals and Geology <br />101 South 3rd, Suite 301 <br />Grand Junction, CO 81501 <br />Dear Mr. Matthews: <br />Sec.o v. <br />Enclosed are copies of the €~e-t quarter 2004 stockpond inspections <br />for those structures at Seneca II-W which have been constructed to <br />date. Inspections for Stockponds T-1, T-2, T-3, T-18, T-20, T-22 and <br />T-29 are included. <br />Should you have any questions, please do not hesitate to call. <br />Sincerely, <br />~~~'t~ <br />Roy Karo <br />Reclamation Manager <br />Enclosure(s) <br />cc. Mr. Michael Boulay <br />Division of Minerals and Geology <br />1313 Sherman Street, Room 215 <br />Denver, CO 80203-2273 <br />Seneca Coal Company • P.O. Box 670 . Hayden, Colorado 81639 <br />Telephone (970) 2763707 • FAX (970) 276-3014 <br />