Laserfiche WebLink
QUARTERLY POND INSPECTION REPORT <br />Bowie Resources Limited Quarter: Fourth 2003 <br />Bowie No. 2 Mine - C-96-083 Inspection Date: 17-Nov-03 <br />Pond Identification <br />Type of Pond <br />Status During Inspection: <br />Approximate Water Level <br />Sediment (% total storage) <br />Outflow (cfs) <br />Fast ~ vna <br />Erosional <br />Rills R Gulleys <br />Inadequate Vegetation <br />Outlet Channel Erosion <br />Burrows <br />Other <br />Differential Settling <br />Cracks or Slides <br />Seepage <br />Other <br />Appurtenant Structures <br />Defective Spillways <br />Dewatering Devices Clogged <br />Faulty Gates, Etc. <br />Comments <br />Required: <br />B C D -Gob Pile J UTL East K UTL West <br />Sediment Sediment Sediment Sediment Sediment <br /> 6' 5.25' 18" WeUMudd 3" <br /> 50% 0% 0% 0% 10°i <br /> 0 0 0 0 0 <br /> <br />- - -Problem- - -Problem- -'-Problem ~- - -P~oblern - _ Piobl~ <br /> Yes/No Yes/No Yes/No Yes/No Yes/I <br /> <br /> No No No No No <br /> No No No Yes Ye: <br /> No No No No No <br /> No No No No No <br /> No No No No No <br />No I No I No <br />The water in Ponds B & C was above the level of the primary spillway. <br />Pond J & K lack good vegetative cover <br />Pond C was being dewatered. Pond B needs to be dewatered. <br />Design depth measured from pond bottom to invert of emergency spillway: <br />Pond B=10, C=7.25, D=7.7, J=6, K=4 <br />,3 . ~~ p ~ ~ ~Sls <br />Dewater Ponds B, C and D. '~b~~ai 3 c .C°~.^°~F9~i <br />oflnspector: JIm Stover <br />