Laserfiche WebLink
E~~A , <br />S ~ea,~o,n~a~Y Seneca Coal Company <br /> <br />April 3, 2003 <br />Mr. Michael Boulay <br />Division of Minerals and Geology <br />1313 Sherman Street, Room 215 <br />Denver, CO. 80203-2273 <br />RECEIVED <br />APR 2 g 2003 <br />Division of Minerals d Geology <br />RE: Seneca II-W Mine (C-82-057) Quarterly Stockpond Inspections <br />Dear Mr. Boulay: <br />Enclosed are copies of the first quarter 2003 stockpond <br />inspections for those structures at Seneca II-W which have been <br />constructed to date. Inspections for Stockponds T-1, T-2, T-3, <br />T-18, T-20, T-22 and T-24 are included. <br />Should you have any questions, please do not hesitate to call. <br />Sincerely, <br />/~~" 7~~ <br />Roy Karo <br />Reclamation Manager <br />Enclosure(s) <br />Seneca Coal Company • P.O. Drawer D • Hayden, Colorado 81639 <br />Telephone (970) 276-3707 • FAX (970) 276-3014 <br />