Laserfiche WebLink
<br /> <br />COAL_ COMPJANY QUARTERLY POND INSPECTION REPORT <br />Inspector Name: (g ~y ,c-ett/~"P Date:_ 6- Z~ 9/ <br /> <br />Pond Number: 7 Date Last Inspection: 9-/ r•9/ <br />Site Name: Nom/R ~eo/iNf Quarter: 7~~~d /59/ <br /> <br />1. Design Depth Measured From Spillway Invert 2. 2~ <br /> <br />2. Design Maximum Sediment Level Measured From Spillway Invert /, 6.f' <br /> <br />3. Sediment Level/Pond Bottom Measured From Spillway Invert 2.0 <br /> <br />4. Water Level Measured From Spillway Invert ,va.v [ <br /> <br />5. Discharge Through Spillway Since Last Inspection Yes X No <br />6. Rills and Gullies Yes X No <br />7. Vegetation Adequate XYes _ No <br />8. Outlet Channel Erosion Yes X No <br />9. Animal Burrows ... Yes k No <br />10. Cracks Yes ~ No <br />11. Seepage _ Yes ?r No <br />12. Spillway Clogged -Yes X No <br />13. Valves Operational ./(~A. _ Yes _ P;o <br />ADDITIONAL COMMENTS: <br />MAINTENANCE REQUIRED: <br />~~11 W 0 ~ ~ ~ W <br />3~ ~~ ooe~a~ <br />SP/[[WAY SLAVE <br />Z <br />~ ~~W C <br />~~ <br />