Laserfiche WebLink
~i <br /> <br />COAL_ COMPJ4NY QUARTERLY POND INSPECTION REPORT <br />Inspector Name: ~ARRy Pere ~kc Oate: 7-19.4 <br />~, <br />Pond Number: 2 Date Last Inspection: 4 -IJ •9/ <br />Site Name: UTG - ,fo.,>~ ~ Quarter: TI„ad /99/ <br />1. Design Depth Measured From Spillway Invert <br />2. Design Maximum Sediment Level Measured From Spillway Invert O.Z 3 <br /> <br />3. Sediment Level/Pond Bottom Measured From Spillway Invert 4,? <br /> <br />4. Water Level Measured From Spillway Invert Ns.v< <br /> <br />5. Discharge Through Spillway Since Last Inspection _ Yes X No <br />6. Rills and Gullies ... Yes ~' No <br />7. Vegetation Adequate a' Yes _ No <br />8. Outlet Channel Erasion _ Yes X No <br />9. Animal Burrows Yes . X No <br />10. Cracks _ Yes 1( No <br />11. Seepage Yes K No <br /> _ <br />12. Spillway Clogged _ Yes X No <br />13. Valves Operational .~!/~ _ Yes , No <br />ADDITIONAL COMMENTS: <br />MAINTENANCE REQUIRED: <br />- - ¢ <br />°~~ o~ G <br /><~ <br />3 ~ ~~ <br /> SP/[tWAY SLAVE <br />-- - -- <br />~ ~ <br />_ ~ ~ <br />h 8~ <br /> <br />v n <br />W <br />'. O h A ~1 <br />