Laserfiche WebLink
<br />COAL COMF~ANY QUARTERLY POND INSPECTION REPORT <br />Inspector Name: ~ARR~y ~erc~~e Date: S-//-9L <br /> <br />Pond Number: 9 Date Last Inspection: 2-/~-9 C <br /> <br />Site Name: /lIROA Quarter: Z -9C <br /> <br />1. Design Depth Measured From Spillway Invert 9,0 <br /> <br />2. Design Maximum Sediment Level Measured From Spillway Invert Q,~ ' <br />3. Sediment Level/Pond Bottom Measured From Spillway Invert G 9 <br /> <br />4. Water Level Measured From Spillway Invert c//t~ <br /> _ <br />5. Discharge Through Spillway Since Last Inspection Yes >`' No <br />6. Ri 11 s and Gullies Yes ~" No <br />7. Vegetation Adequate ,Y' Yes No <br />8. Outlet Channel Erosion Yes k No <br />9. Animal Burrows Yes X No <br />10. Cracks Yes ~ No <br />11. Seepage Yes ~' No <br />12. Spillway Clogged _ Yes X No <br />13. Valves Operational X Yes No <br />ADDITIONAL COMMENTS: <br />MAINTENANCE REQUIRED: <br />-- ¢ F ? ~ -- <br />~ v 0 ~ ~ ~ ~ <br />3 'r" ~~ o on O h m a <br />SPI[[WAY SNV! <br />~ a ~ v ~ <br />R ~~1 <br />